Middle East & Africa Data Center Construction Market worth US$831 Million 2021 with a CAGR of 9.42%

" Middle East & Africa Data Center Construction Market, By Electrical Infrastructure (UPS System Generators, Transfer Switches and Switchgears, Rack PDUs, and Other Electrical Infrastructure),

The report " Middle East & Africa Data Center Construction Market, By Electrical Infrastructure (UPS System Generators, Transfer Switches and Switchgears, Rack PDUs, and Other Electrical Infrastructure), By Mechanical Infrastructure (Cooling Systems, Racks, and Other Mechanical Infrastructure), By Tier Standards (Tier I & II, Tier III, and Tier IV), By General Construction (Building Design Services, Building Development, Installation and Commissioning Services, DCIM, and Physical Security Systems), and By Region (GCC, Israel, South Africa, Rest of Middle East & Africa) - Trends, Analysis, and Forecasts Till 2030”.

Key Highlights:

In January 2020, six ways data analytics is transforming BIM. The use of Building Information Modelling (BIM) is rapidly increasing in the design, construction, operation and maintenance of building and infrastructure assets. The reason is simple according to AECOM’s James Rosenwax and Ben May: digital technology is making it easier, cheaper and more efficient to manage buildings and infrastructure projects through digital models.
In September 2018, Fortis Construction opened a new data center office at Singapore, which will provide general construction services to Facebook. This will be the first data center of Facebook in Asia.
Analyst View:

Increasing smartphone users, growing broadband connectivity, rising adoption of new technologies, and high demand for colocation services are factors driving the MEA data center construction market. The investment in the data center market in Middle East and Africa (MEA) region is growing significantly, aided by the construction of data center facilities by telecommunication providers, enterprises, government, cloud and colocation service providers. Increased adoption of prefabricated data center solutions adds tremendous growth to the market. In addition, investments to improve broadband connectivity and advancement in technology are expected to boost the market over the forecast period. Moreover, rising investments in Hyper scale facilities and growing emphasis on renewable energy in data centers is the major key factor contributing growth to the market.

Browse 60 market data tables* and 35 figures* through 140 slides and in-depth TOC on “Middle East & Africa Data Center Construction Market, By Electrical Infrastructure (UPS System Generators, Transfer Switches and Switchgears, Rack PDUs, and Other Electrical Infrastructure), By Mechanical Infrastructure (Cooling Systems, Racks, and Other Mechanical Infrastructure), By Tier Standards (Tier I & II, Tier III, and Tier IV), By General Construction (Building Design Services, Building Development, Installation and Commissioning Services, DCIM, and Physical Security Systems), and By Region (GCC, Israel, South Africa, Rest of Middle East & Africa) - Trends, Analysis, and Forecasts Till 2030”.

Key Market Insights from the report:

The Middle East & Africa data center construction market accounted for US$831 million in 2021 and is projected to register a moderate CAGR of 9.42% over the forecast period. The market report has been segmented on the basis of electrical infrastructure, mechanical infrastructure, tier standards, general construction and region.

Based on electrical infrastructure, the Middle East & Africa data center construction market is segmented into UPS system generators, transfer switches and switchgears, rack PDUs, and other electrical infrastructure.
Based on mechanical infrastructure, the target market is segmented into cooling systems, racks, and other mechanical infrastructure.
Based on tier standards, the target market is segmented into tier I & II, tier III, and tier IV.
Based on general construction, the target market is segmented into building design services, building development, installation and commissioning services, DCIM, and physical security systems.
To know the upcoming trends and insights prevalent in this market, click the link below:

Links:https://prophecymarketinsights.com/market_insight/Middle-East-Africa-Data-Center-4088

Competitive Landscape:

The prominent player operating in the Middle East & Africa data center construction market includes CORGAN, Currie & Brown Holdings Limited, DPR Construction, Holder Construction Company, AECOM, Arup, Structure Tone, Jones Engineering Group, Turner Construction Company, and FORTIS CONSTRUCTION, INC.

The market provides detailed information regarding industrial base, productivity, strengths, manufacturers, and recent trends which will help companies enlarge the businesses and promote financial growth. Furthermore, the report exhibits dynamic factors including segments, sub-segments, regional marketplaces, competition, dominant key players, and market forecasts. In addition, the market includes recent collaborations, mergers, acquisitions, and partnerships along with regulatory framework across different regions impacting the market trajectory. Recent technological advances and innovations influencing the global market are included into the report.

About Prophecy Market Insights

Prophecy Market Insights is specialized market research, analytics, marketing/business strategy, and solutions that offers strategic and tactical support to clients for making well-informed business decisions and to identify and achieve high-value opportunities in the target business area. We also help our clients to address business challenges and provide the best possible solutions to overcome them and transform their business.

Some Important Points Answered in this Market Report Are Given Below:

Explains an overview of the product portfolio, including product development, planning, and positioning
Explains details about key operational strategies with focus on R&D strategies, corporate structure, localization strategies, production capabilities, and sales performance of various companies
Detailed analysis of this XYZ market revenue in previous & next coming years
Examining various outlooks of the XYZ market with the help of Porter’s five forces analysis.
Study on the product type that is anticipated to dominate the XYZ market.
Study on the regions that are expected to register the fastest growth over the forecast period.
Key Topics Covered

Introduction
Study Deliverables
Study Assumptions
Scope of the Study
Research Methodology
Executive Summary
Opportunity Map Analysis
Market at Glance
Market Share (%) and BPS Analysis, by Region
Competitive Landscape
Heat Map Analysis
Market Presence and Specificity Analysis
Investment Analysis
Competitive Analysis
To know more

Contact Us:

Sales

Prophecy Market Insights

Email- [email protected]
Contact Email
[email protected]
Issued By
Prophecy Market Insights
Phone
7775049802
Business Address
964 E. Badillo Street #2042
Country
United States
Categories
Business
Last Updated
November 1, 2021
Report Abuse · Content Requests